CyberPower BP36V60ART2U Bedienungsanleitung
CyberPower
Nicht kategorisiert
BP36V60ART2U
Lies die bedienungsanleitung für CyberPower BP36V60ART2U (14 Seiten) kostenlos online; sie gehört zur Kategorie Nicht kategorisiert. Dieses Handbuch wurde von 13 Personen als hilfreich bewertet und erhielt im Schnitt 4.7 Sterne aus 7 Bewertungen. Hast du eine Frage zu CyberPower BP36V60ART2U oder möchtest du andere Nutzer dieses Produkts befragen? Stelle eine Frage
Seite 1/14

User’s Manual
EXTENDED BATTERY MODULE (EBM)
BP36V60ART2U
BP72V60ART2U
Cyber Power Systems (USA), Inc.
4241 12th Avenue East Suite 400 Shakopee, MN 55379
Phone: -297-6937 877
Fax: 952-403-0009
http://www.cyberpowersystems.com
K01-0000 5-03 51

Copyright © Cyber Power Systems, Inc.2020
OVERVIEW
1
The CyberPower extended battery modules (BP V60ART2U V ART2U) support A polarized plugs, and are designed for variety of Cyber Power 36 / BP72 60 60
UPS systems. When combining with the UPS, the provides extended runtime with a VDC/72VDC external connection. Additional parallel-connected EBM 36
EBM provide the UPS for a longer extended runtime operation.
1K/1.5KVA or 2K/3KVA extended battery module
User’s manual Register card
Rackmount left rail Rackmount right rail
Left hanging bracket Right hanging bracket
IEC320 C14 to NEMA 5-15P power cord
Rackmount ears (Stands) (2)
Tie plate (1)
M5X7L black at head screws (8)
M5X12L black pan head screws ( ) 12
M5X6L silver pan head screws (6)
Plastic washers (8)
Screw hole dust covers ( ) 12
Rubber feet (12)
UNPACKING

Copyright © Cyber Power Systems, Inc.2020
HARDWARE INSTALLATION
2
HARDWARE INSTALLATION
These versatile can be mounted in a rackmount or vertical tower EBM
orientation. This is especially important to growing organizations with
changing needs that value having the option to position an EBM on the
floor or in a rackmount system. Please follow the instructions below for
the respective mounting methods.
SAFETY PRECAUTIONS
CAUTION! To prevent the risk of fire or electric shock, only use the
supplied hardware to attach the mounting brackets.
RACKMOUNT INSTALLATION R 4-POST RACK FO
Step 1 Remove the dust covers :
Remove the dust covers *5 pcs from the screw holes.
Step 2: Rackmount e s & hanging brackets installation ar
Attach two rackmount ears to the EBM using the provided M5X7L*8pcs
screws and tighten two hanging brackets with the M5X6L*6pcs screws.
Step 3: Rackmount rail Installation
The rails adjust to mount in 48-cm (19-inch) wide racks from 52 to
91.5cm (20.5 to 36 inches) deep. Select the proper holes in the rack for
positioning the in the rack. The takes up 2 rack units. EBM EBM
Position the guide screws on the rails into the rear rack square holes to
temporarily support the rails in place. Tighten the front rail screws on the
rack.
Produktspezifikationen
Marke: | CyberPower |
Kategorie: | Nicht kategorisiert |
Modell: | BP36V60ART2U |
Brauchst du Hilfe?
Wenn Sie Hilfe mit CyberPower BP36V60ART2U benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten
Bedienungsanleitung Nicht kategorisiert CyberPower
13 Oktober 2024
7 Oktober 2024
4 Oktober 2024
24 September 2024
24 September 2024
24 September 2024
24 September 2024
24 September 2024
24 September 2024
24 September 2024
Bedienungsanleitung Nicht kategorisiert
- Chamberlain
- BendixKing
- Stiebel Eltron
- EZ Dupe
- National Geographic
- BrightSign
- Nvidia
- EXIT
- Stalco
- HammerSmith
- BeamZ
- Sure Petcare
- Smit Visual
- BlendMount
- Cool Maker
Neueste Bedienungsanleitung für -Kategorien-
17 Juni 2025
17 Juni 2025
17 Juni 2025
17 Juni 2025
17 Juni 2025
17 Juni 2025
17 Juni 2025
17 Juni 2025
17 Juni 2025
17 Juni 2025