Metro C539-CLFS-U-BU Bedienungsanleitung

Metro Nicht kategorisiert C539-CLFS-U-BU

Lies die bedienungsanleitung für Metro C539-CLFS-U-BU (32 Seiten) kostenlos online; sie gehört zur Kategorie Nicht kategorisiert. Dieses Handbuch wurde von 4 Personen als hilfreich bewertet und erhielt im Schnitt 4.8 Sterne aus 2.5 Bewertungen. Hast du eine Frage zu Metro C539-CLFS-U-BU oder möchtest du andere Nutzer dieses Produkts befragen? Stelle eine Frage

Seite 1/32
INSTRUCTIONS FOR USE
C5 3 SERIES - 1 SERIES
HOLDING & PROOFING CABINETS
TABLE OF CONTENTS
SECTION PAGE
I. Basic Operating Guidelines .....Inside Front Cover
II. Safety Information .............................................. 3
III. Identifying Your Cabinet .................................... 4
IV. Installation & Set-up ........................................... 5
V. Product Features ............................................... 9
VI. Operating Instructions .......................................10
VII. Care & Maintenance .......................................... 12
VIII. Basic Troubleshooting ....................................... 13
IX. Service & Replacement Parts ............................ 15
X. Warranty .............................................................28
3 Series
1 Series
Metro Heated Cabinets are for
Hot Food Holding applications only.
DESCRIPTION
This manual covers cabinets with electrical ratings of: 120V-60 Hz-2000W, 120V-60 Hz-1440W,
220-240V, 50/60 Hz, 1681 – 2000W and 220-240V, 50/60 Hz, 1210 – 1440W
C5 1-3 SERIES HOLDING & PROOFING CABINETS — INSTRUCTIONS FOR USE
2
www.metro.com
L01-430
REV W 01/22
BASIC CABINET SETUP
A. Refer to DATA PLATE for electrical requirements. Cabinets rated at 120V 1440W must be
plugged into either a 15 amp or 20 amp 125VAC receptacle. Cabinets rated at 120V 2000W
must be plugged into a 20 amp 125VAC receptacle and used on an individual branch circuit.
Cabinets rated at 220-240V must be plugged into a 15 amp 250VAC receptacle.
B. With POWER switch OFF, plug into VAC grounded receptacle.
C. Fill stainless water pan to top with clean HOT tap water for Proofing, Combination, and Moisture
holding modules. Check water level every 3 hours (2 hours when Proofing) and refill with clean
HOT tap water as necessary.
HOLDING INSTRUCTIONS (Holding, Combo, Moisture Holding)
1) Set Combination Module switch to HOLD.
2) Set POWER switch to the ON position.
3) Set TEMPERATURE control to 10.
4) Moisture Module Only: Set MOISTURE control to 10 (or desired level).
5) Pre-heat cabinet until desired temperature is reached (typical heat-up time from 72°(22°C)
ambient to 160°(71°C)is approximately 45 minutes).
6) Re-set TEMPERATURE control and adjust as necessary to reach desired
temperature - setting 6-8 is typical for 150°(66°C) to 160° (71°C). Indicator light will turn on and
off as the heat thermostat cycles.
PROOFING INSTRUCTIONS (Combo and Proong)
1) Set Combination Module switch to PROOF.
2) Set POWER switch to the ON position.
3) Set TEMPERATURE control to 2.
4) Set MOISTURE control to 10.
5) Pre-heat cabinet until desired temperature and humidity is reached (typical heat-up time from
72°(22°C)ambient to 95°(35°C)and 95% relative humidity is approximately 30 minutes).
6) Adjust settings as necessary to reach desired temperature and humidity levels. Power indicator
lights will turn on and off as the heat and moisture thermostats cycle.
3 & 1 SERIES


Produktspezifikationen

Marke: Metro
Kategorie: Nicht kategorisiert
Modell: C539-CLFS-U-BU

Brauchst du Hilfe?

Wenn Sie Hilfe mit Metro C539-CLFS-U-BU benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten