Lies die bedienungsanleitung für Raytec Spartan (16 Seiten) kostenlos online; sie gehört zur Kategorie Erleichterung. Dieses Handbuch wurde von 43 Personen als hilfreich bewertet und erhielt im Schnitt 4.5 Sterne aus 22 Bewertungen. Hast du eine Frage zu Raytec Spartan oder möchtest du andere Nutzer dieses Produkts befragen? Stelle eine Frage
Seite 1/16

SPARTAN
Floodlight Range Installation Guide
CML13ATEX3007 IEC Ex CML14.0001
This installation guide provides instructions for installing the Infra-Red and
White-Light SPARTAN SPX series of explosion protected oodlights.
Text in Bold is specic for emergency variants
Overview
1 Safety Instructions
2 Installation
3 Maintenance
4 Technical Specication
5 Trouble Shooting
The SPARTAN series of explosion protected oodlights are specialist devices,
certied for use in specic operating environments.
The units must be installed in accordance with these instructions, must be correctly
certied for the specic operating environment and must be installed by suitably
qualied personnel.
Emergency oodlights will require the fuse to be reconnected upon
installation and the oodlight subjected to three 24 hour charge/discharge
cycles to bring the battery up to peak capacity.
If you have any queries about the installation or the certication of the unit – please
contact Raytec for immediate assistance and advice.
910-M-0094-2
Important information

2www.rayteccctv.com UK / Europe Tel: +44 (0) 1670 520055
Americas Tel: +1 613 270 9990
1. Safety instructions
1. Read this leaet carefully before commencing to install the SPARTAN unit and
retain it for future use. Installation can only be carried out by suitably qualied
personnel.
2. Check the certication to ensure that the mains supply and the ambient
temperature present is suitable for the unit being installed.
3. If the SPARTAN unit is to be installed in areas of high vibration, please consult
with Raytec.
4. The SPARTAN unit housing is constructed from marine grade aluminium and
toughened glass. The end user must ensure that these materials are suitable
for the environment the SPARTAN unit will be installed in; Zone 1 and Zone 2
Hazardous areas.
5. Check certication nameplate on side of oodlight to ascertain type of threaded
cable entry on the luminaire. Select suitably certied ATEX/IEC Ex cable glands
and stopper plugs, these must be parallel thread, have a minium of 5 full thread
engagement and be of a medium/ne tolerance to ISO965-1 and ISO965-3. The
cable entry devices selected must maintain the IP rating of the luminaire
6. The incoming mains cable should not exceed a temperature rise of 20 C above °
the ambient conditions; select suitable cable.
!
Install in a well
ventilated area
Do not continually
stare at lamp
Isolate mains before
removing cover
1.5m

3www.rayteccctv.comUK / Europe Tel: +44 (0) 1670 520055
Americas Tel: +1 613 270 9990
2. Installation
Mounting SPARTAN Unit
1. To meet the requirements of certication a MINIMUM of 2 xing points must be
used, the xing points must be suitable for the conditions of use.
Spartan 12 Floodlight
Spartan 24 (Emergency Variant Shown)
Produktspezifikationen
Marke: | Raytec |
Kategorie: | Erleichterung |
Modell: | Spartan |
Brauchst du Hilfe?
Wenn Sie Hilfe mit Raytec Spartan benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten
Bedienungsanleitung Erleichterung Raytec
30 August 2024
Bedienungsanleitung Erleichterung
- Elro
- Smith-Victor
- ColorKey
- Obsidian
- Manfrotto
- EasyMaxx
- Eglo
- Metabo
- Blumfeldt
- Adviti
- GP
- DTS
- Klein Tools
- COLBOR
- NUVO
Neueste Bedienungsanleitung für -Kategorien-
16 Oktober 2024
13 Oktober 2024
13 Oktober 2024
9 Oktober 2024
8 Oktober 2024
8 Oktober 2024
7 Oktober 2024
7 Oktober 2024
6 Oktober 2024
5 Oktober 2024