Sloan HYB-1000 Bedienungsanleitung

Sloan Toilette HYB-1000

Lies die bedienungsanleitung für Sloan HYB-1000 (1 Seiten) kostenlos online; sie gehört zur Kategorie Toilette. Dieses Handbuch wurde von 40 Personen als hilfreich bewertet und erhielt im Schnitt 5.0 Sterne aus 20.5 Bewertungen. Hast du eine Frage zu Sloan HYB-1000 oder möchtest du andere Nutzer dieses Produkts befragen? Stelle eine Frage

Seite 1/1
®
A
B
HYB-1000 HYBRIDURINAL
with Jetrinse™ Solution
with Jetrinse™ Solution
with Jetrinse™ Solution
with Jetrinse™ Solution with Jetrinse™ Solution
Technology
Technology
Technology
TechnologyTechnology
NEW CONSTRUCTION
INSTALLATION INSTRUCTIONS
BEFORE STARTING INSTALLATION:
IMPORTANT Do not install on copper DWV
due to copper’s susceptibility to corrosion.
TUBE CUTTING CHART
Measure drain nipple depth (inches) to find trim
length (inches)
13 7/8” or more DO NOT CUT
3 3/4” or less DO NOT USE TUBE
OR LESSTRIM
13 ¾"¼"
13 ½½
13 ¼¾
13 1
12 ¾
12 ½
12 ¼
12 2
11 ¾
11 ½
11 ¼
11 3
10 ¾3 ¼
10 ½3 ½
ORSSTRIM LE
10 ¼"3 ¾"
10 4
9 ¾4 ¼
9 ½4 ½
9 ¼4 ¾
95
8 ¾5 ¼
8 ½5 ½
8 ¼5 ¾
86
7 ¾6 ¼
7 ½6 ½
7 ¼6 ¾
77
OR LESSTRIM
6 ¾"7 ¼"
6 ½7 ½
6 ¼7 ¾
68
5 ¾8 ¼
5 ½8 ½
5 ¼8 ¾
59
4 ¾9 ¼
4 ½9 ½
4 ¼9 ¾
410
CRREUSTOME CA
1-800-982-5839
CANUTIO Aftronrinrothe er emving ay ual fm
drninetai l, is notain nally ormal for ceraturccurring,
butte potenl zardouew tia lyhas ser gaseso escap
throinhwaterlrtrie ugh the open ng util te ess cadg
istrrlntwaterrlIyou insalled popey io the less uina . f
neee n d toav leaorunattfter pen dain line ended a
remov ngriromwa l,teorariy wewer a i the unal f the l mpldge paper tols o
rag intoran toreduce the dihole anyowwer s,d reove out of segase anm
the paper towelsorrarir to corirtridge g pompleting the unal or ca
insllatontai. Never smoke, have ce youan opename, or plar n or ose
mouh nedraeswaterlalnto wh tar open in lin or ess urin housings ihic
a cartdgyeroperld.rie is not t py installeYoo wear a g u alscan breathin
mamisk rewhen ov nglinyterlril orrtridgto or instalng a waess una cae
reduceotent alexsure tonys pi po a such gase
Sloan.com
The information in this document is subject to change without notice.
©2018 Sloan Valve Company All rights reserved.
9
5
1
13
Cut away wall
Lift drain line & brace
with mending plate
½" to ¾"
9 MAX."for ADA
installation
standard 24" rim
finihed oors
16”
4
6
32
C D
10 12
14
11
15
Arrow
tab UP
1234
A
C
BD E
Set drain line height 16” from finished floor
(standard 24” rim) or 9” Max. for ADA installation.
Threaded nipple should extend 1/2 to 3/4” from wall.
* IMPORTANT Nipple must not extend more than
3/4” past the finished wall
Carrier stud placementIf
using in-wall carrier set
bearing as shown above.
A. Clean Face of drain nipple.
B. Install the clear inspection disc with the compression nut.
C. Slowly pour water into the drain.
D. Use a flashlight to check the pitch/slope no water should be
present in the inspection disc or nipple.
E. Remove disc and nutafter inspection.
Adjust drain to achieve pitchonly if standing water is present
(code requires 1/4” drop per foot of drain line for proper
pitch). Seal wall according to code.
Measure and mark rough in.If in-wall carrier
is not used. Use a 5/16” masonry bit to drill
hole, then install the hanger bracket with
one plastic anchor and screw.
11 10
12
8
Determine the drain nipple lengthby
measuring the distance between the back
of the sanitary tee (or elbow) to the front
edge of the nipple.
A. Find the drain nipple depthon the Tube
Cutting Chart (left). Measure and mark the
specified trim length on the insert tube at the
nearest 1/4” groove.
B. Cut the tube at the groove using a sharp
utility knife to ensure a square, flat cut.
C. Clean burrsfrom the cut end by using
emery paper.
D. Apply lubricantto the outside of the rubber
bushing and ribbed inside area.
E.Insert tube and bushingIMPORTANT. Be sure
arrow tab is at the 12:00 position.
Apply lubricant to
tailpipe of housing.
Place hose clamp and
compression nutonto
the housing tailpipe.
Drill holeswith 3/16”
masonry bit for the
lower anchor screws
and insert plastic
anchors.
Hang the bowlinserting
tailpipe into bushing, and
tighten coupling and
hose clamp. Install anchor
screws with washers.
Connect battery A to wire B.
Wait 1 minute for system to start up. Note
system will allow 2 manual flushing before
pausing 30 seconds.
Put adaptor onto stop then
attach supply line to adapter.
Turn water on and assure there
are no connection leaks.
AB
7
A. Hang bowl on the bracketand check tail pipe alignment, then remove the bowl
and adjust the bracket as needed. Re-hang and re-check bowl alignment with the
drain line. Tail pipe should align with center of drain line.
B. Mark anchor holesthen remove bowl without moving hanger bracket.
16
CARTRIDGE
INSTRUCTIONS
17 18
Caulk the bowlto the wall if
there is good flow and no leaks or
standing water in housing.
Install cartridge as per the
cartridge instruction sheet.
If standing water exists,line is
clogged or there is improper slope
installed in housing. See step 4, correct
and reinstall urinal
Wave hand under IR switch to
activate test rinse and ensure there
is no standing water in housing.
System will operate automatically
every 48 hours from battery plug in.
CORRECT
DOWNCH/HILPITL SLOPE
(DE)MEETCOS
INCORRECT
Not centered
CORRECT
Centered
Install 1/2” x 3/8” compression
straight stop with the handle facing
floor.
LOOKING AT WALL
LUBRICANT
*
21 ½”
Install Plastic Anchor Here
Insert Screws
Here
Drain
13 5/8
6 2/3
1/2
21 1/2
3¼"
3"
C
ADA requires a lip height of 17” or lower. To allow for
variances and assure compliance Sloan recommends
roughing the drain line to achieve a 16-½ ” lip height
Check slope. Downhill slope, per code, is essential
because waterfree urinals depend on gravity flow.
Check DWV material. Suitable materials include
cast iron, PVC, ABS and galvanized steel.


Produktspezifikationen

Marke: Sloan
Kategorie: Toilette
Modell: HYB-1000

Brauchst du Hilfe?

Wenn Sie Hilfe mit Sloan HYB-1000 benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten