Eltako DSZ15WDM-3x5A Bedienungsanleitung

Eltako Messgeräte DSZ15WDM-3x5A

Lies die bedienungsanleitung für Eltako DSZ15WDM-3x5A (2 Seiten) kostenlos online; sie gehört zur Kategorie Messgeräte. Dieses Handbuch wurde von 58 Personen als hilfreich bewertet und erhielt im Schnitt 3.5 Sterne aus 29.5 Bewertungen. Hast du eine Frage zu Eltako DSZ15WDM-3x5A oder möchtest du andere Nutzer dieses Produkts befragen? Stelle eine Frage

Seite 1/2
CT operated energy meter with settable CT ratio and MID.
Maximum current 3x5A. Standby loss 0.5 watt per path only.
Modular device for DIN-EN 60715 TH35 rail mounting.
4 modules = 70mm wide and 58mm deep.
Accuracy class B (1%).With M-bus interface.
This three-phase metermeasures active energy by means of the currents
flowing between inputs and outputs. The internal power consumption of
0.5 watt active power per path is neither metered nor indicated.
1, 2 or 3 converters with secondary currents of up to 5 A can be connected.
The inrush current is1OmA. The N terminal must always be connected.
The 7 segment LC display is also legible twice within a period of 2 weeks
without power supply.
Power consumption is indicated by an LED flashing at a rate of10 times per KWh.
On the right next to the display are the MODE and SELECT buttons to browse
through the menu. First the background lighting switches on. Then the total
active energy, the active energy of the resettable memory and the instantaneous
values of power, voltage and current are displayed for each outer conductor.
The CT ratio can also be set. It is set to 5:5 at the factory and blocked with a
bridge over the terminals which are marked with 'JUMPER'. To adjust the CT
ratio to the installed transformer remove the bridge and reset the energy
meter according to the operation manual.
Then block it again with the bridge.
Adjustable current transformer ratios: 5:5, 50:5,100:5,
150:5, 200:5,
250:5, 300:5, 400:5, 500:5, 600:5, 750:5,1000:5,1250:5 and1500:5.
Error message (false)
If there is no outer conductor of the current direction is incorrect, 'false' and
the related outer conductor are indicated in the display.
M-bus data transfer
On read-out all values are transferred in a telegram.
The following telegrams are supported:
- Initialisation: SND_NKEReply: ACK
- Read out meter: REQ_UD2Reply: RSP_UD
- Change primary address: SND_UDReply: ACK
- Reset RS1: SND_UDReply: ACK
- Slave selection for the secondary addressReply: ACK
The device does not reply to unknown requests
The transfer rate is detected automatically
The device has a voltage monitor. In case of voltage loss,
all registers are saved in the EEPROM.
Changing the M-bus primary address:
To change the M-bus primary address, hold down SELECT for 3 s. In the menu
that appears, press MODE to increment the address by10. Press SELECT to
increment by1. When the required primary address is set, wait until the main
menu reappears.
Secondary address:
It is possible to communicate with the energy meter according to the
standard EN13757 with help of the secondary address.
The use of wildcards is possible.
Detailed information are available in the operating manuals at www.eltako.com
Important! Before working on the current transformers disconnect the voltage
paths of the energy meters.
M-bus three-phase meter for use with CT
DSZ15WDM-3x5A with display and MID approval
Only skilled electricians may install this electrical equipment
otherwise there is the risk of fire or electric shock!
Temperature at mounting location: -25°C up to +55°C.
Storage temperature: -25°C up to +70°C.
Relative humidity: annual average value <75%.
28 305 515 - 1
GB Typical connection:
4-wire-connection 3x230/400V
The secondary current converter terminals on the mains side must be
connected to the outer conductors measured. These connections for the
meter power supply must be protected according to local installation
regulations.
Terminal cover sealableTerminal cover claps
Protection degreelP50 for mounting in distribution cabines
with protection class IP51
Maximum conductor cross section1) N and L terminals16mm2,
M-Bus terminals and jumper terminals 6mm
2
Recommended torque2) L- and N terminals1,5Nm (max. 2,0Nm)
M-Bus terminals and jumper terminals 0,8Nm (max.1,2Nm)
EC type examination certificate0120/SGS0314
The energy meter is used indoors.
Mechanical environmental conditionsclass M1
Electromagnetic environmental conditionsclass E2
1) The carrying capacity of cables and wires is defined in DIN VDE 0298-4.
2) The torques for screw terminals are mentioned in DIN EN 60999-1.
To avoid damages at the energy meter, the recommended torque values for each terminal
must not be exceeded!
Technical data
Rated voltage, extended range3x230/400V, 50Hz,
-2O%/+15%
Reference current Iref (Limiting current Imax)3x0.05 - 5(6)A
Internal consumption active power0.5W per path
DisplayLC display 7 digits,
therefrom1digit after the decimal point
Accuracy class ±1%B
Inrush current according to accuracy class B1OmA
Operating temperature-25/+55°C
Bus systemM-Bus
Bus length According to M-bus specifications
Transfer rates 300, 2400, 9600 baud.
Response timeWrite up to 60ms
(system response time)Read up to 60ms


Produktspezifikationen

Marke: Eltako
Kategorie: Messgeräte
Modell: DSZ15WDM-3x5A

Brauchst du Hilfe?

Wenn Sie Hilfe mit Eltako DSZ15WDM-3x5A benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten