Sloan SS-3117 Bedienungsanleitung


Lies die bedienungsanleitung für Sloan SS-3117 (2 Seiten) kostenlos online; sie gehört zur Kategorie Spülbecken. Dieses Handbuch wurde von 11 Personen als hilfreich bewertet und erhielt im Schnitt 4.5 Sterne aus 6 Bewertungen. Hast du eine Frage zu Sloan SS-3117 oder möchtest du andere Nutzer dieses Produkts befragen? Stelle eine Frage

Seite 1/2
64
70
[194]
[286]
11.25
[863]
34
FINISHED
FLOOR
[103]
4
MOUNTING
BRACKET
HOLES (4)
sink rim. Mark level line on wall. This line is
centerline of holes for wall hanger bracket
mounting holes.
Mark and drillholes in wall for mounting lavatory
BEFORE YOU START…
Check all local plumbing and building codes.
Check for any damage to the new lavatory sink
before installation.
WHAT YOU WILL NEED…
Putty knife10” adjustable wrench
Safety glassesPhillips screwdriver
Measuring tapeFlathead screwdriver
Basin wrenchDrill
Tube cutterPlumbers putty
HacksawSilicone sealant
Channel lock pliers
THE RIGHT CHOICE
We thank you for your purchase. Our products are
100% tested but should you have any questions,
please contact us by phone or at our web site.
Enameled Cast Iron Wall-Hung Lavatory Installation
Model
SS-3017 / SS-3117
The information contained in this document is subject to change
without notice.
SLOAN VALVE COMPANY
10500 Seymour Avenue
Franklin Park, IL 60131
Phone: 1-800-9-VALVE-9 (982-5839)
or 1-847-671-4300
Fax: 1-800-447-8329 or 1-847-671-4380
www.sloanvalve.com
Copyright © 2019 Sloan Valve Company
Code No. 0816874 Rev. 1 (08/19)
RETROFIT INSTALLATIONS
1.REMOVE EXISTING LAVATORY
Turn off the water supply.
Disconnect the supply lines and waste pipes.
Remove the existing lavatory.
Scrape any old putty or sealant from wall surface.
Remove old wall bracket and discard.
Adequate structural support in or behind the wall
is required to withstand the weight of the lavatory
when lled with water.
2.CLEAN DRAIN
Clean out waste pipe using hand or power cleaner
to be sure pipe is clear.
Proceed to NEW INSTALLATIONS.
Wall Carrier rough-in information to be provided by wall carrier
manufacturer. Carrier and hardware not included with xture
SS-3017
NEW INSTALLATIONS
1.PRIOR TO NEW INSTALLATION
Determine appropriate wall location for the lavatory.
Consider that hot and cold water supply lines with
supply stops or a tempered water supply line with
supply stop and a drain line will be required. A 120V
electrical source (receptacle) may also be required.
Compare the physical dimensions of the lavatory to
the space available for the installation.
2.UNPACK AND INSPECT LAVATORY
Carefully remove sink from its protective carton so
as not to damage nish. Check for any damage to
lavatory before proceeding with the installation.
Examine the carton for additional parts before
discarding packaging.
3.INSTALL DRAIN AND FAUCET
Install the faucet and drain assembly (not included).
Follow faucet manufacturers instructions. Use
plumbers putty to ensure a water seal.
4.INSTALL NEW WALL HANGER BRACKET
Reinforced wall framing
Holes for Hanger Bracket
Note: Adequate reinforced wall framing is
required behind the wall for proper hanger
bracket support. Use of wall anchors or toggle
bolts is not recommended. For concrete walls
a properly sized wall anchor can be used.
Mount and level wall hanger bracket using six (6)
screws and washers (not supplied)
5.INSTALL LAVATORY ON WALL BRACKET
Note: Check if lavatory is level. If not level,
remove lavatory and adjust wall bracket as
needed.
Install two (2) 5/16” anchor bolts (not supplied),
through the (2) 3/8” anchor holes, in the sink and into
the wall.
COMPLETING THE INSTALLATION
Connect all supply lines and waste pipes.
Turn on water. Check to see that the faucet
and drain are operating properly and there
are no leaks.
Caulk around lavatory perimeter where lavatory
meets the wall.
Record lavatory model number for reference.
CARE AND CLEANING OF SLOAN FIXTURES
LIMITED WARRANTY
Sloan Valve Company warrants its products to be made
of rst class materials, free from defects of material
or workmanship under normal use and to perform the
service for which they are intended in a thoroughly
reliable and efcient manner when properly installed
and serviced, for a period of three years from date of
purchase. During this period, Sloan Valve Company
will, at its option, repair or replace any part or parts
which prove to be thus defective if returned to Sloan
Valve Company, at customer’s cost, and this shall
be the sole remedy available under this warranty. No
claims will be allowed for labor, transportation or other
incidental costs. This warranty extends only to persons
or organizations who purchase Sloan Valve Company’s
products directly from Sloan Valve Company for
purpose of resale.
THERE ARE NO WARRANTIES WHICH EXTEND
BEYOND THE DESCRIPTION ON THE FACE
HEREOF. IN NO EVENT IS SLOAN VALVE COMPANY
RESPONSIBLE FOR ANY CONSEQUENTIAL
DAMAGES OF ANY MEASURE WHATSOEVER.
NOTE: IN NO EVENT SHALL THE SLOAN VALVE
COMPANY BE LIABLE FOR INCIDENTAL DAMAGES,
RESULTING FROM IMPROPER INSTALLATION, OR
FOR DAMAGES CAUSED BY NEGLECT, ABUSE OR
ALTERATION.
All dimensions shown in these drawings are nominal and not to
scale. Dimensions can vary within the tolerances established in
the governing ASME A112.19.1-2008. It is important to consider
this when planning rough-in and plumbing layouts.
Clean lavatory with a cleaner safe for enameled cast
iron. Spray and wipe clean using soft cloth. Soft
abrasive cleaners may be used to remove stains.


Produktspezifikationen

Marke: Sloan
Kategorie: Spülbecken
Modell: SS-3117

Brauchst du Hilfe?

Wenn Sie Hilfe mit Sloan SS-3117 benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten