Lies die bedienungsanleitung für Stratco Allure (14 Seiten) kostenlos online; sie gehört zur Kategorie Nicht kategorisiert. Dieses Handbuch wurde von 19 Personen als hilfreich bewertet und erhielt im Schnitt 4.1 Sterne aus 5 Bewertungen. Hast du eine Frage zu Stratco Allure oder möchtest du andere Nutzer dieses Produkts befragen? Stelle eine Frage

Seite 1/14
ALLURE™ ALUMINIUM LOUVRE-PATIO INSTALLATION GUIDE
ALLURE
INSTALLATION GUIDE
INSTALL GUIDE
Drill and Hex-Head Adaptor
Rivet Gun
Tape Measure
Tin Snips
Spirit Level
Post Hole Digger
Silicone Gun
Spanners or Ratchet
Adjustable Construction Props
Concrete
Ladder
Vise Grips
Countersinking Drill Bit
Phillips-Head Screwdriver
Hole-Saws (ø13mm & ø16mm)
TOOLS REQUIRED
BEFORE YOU START
Carefully read these instructions and refer to them constantly during each stage of construction. If you do not have all the necessary tools or information,
contact Stratco for advice. Before starting, layout all components and check them against the delivery docket. The parts description identifies each key part,
and the component layout diagram indicates their fastening position.
Double check all dimensions, levels and bolting locations before cutting, screwing or bolting structural members. It is recommended that the installers erecting
the structure have had some previous building experience because some modifications to the existing house structure may be required. If a freestanding unit
is being installed, the attachment beam becomes the rear fascia beam and is installed as per the details for the front fascia beam. Box gutters and flashings do
not need to be pre-fixed until all beams have been erected.
Note: All screws within the unit must be fastened by hand using a screw-driver, or a low-torque, low-speed drill.
Using a powered tool may result in screw heads shearing from the shank. If screw heads shear from shank it is recommended
that a Screw Extractor kit is used to remove the screw.
Note: Allure components are designed for 1° fall to accommodate the minimum required louvre fall and Allure
construction should allow for this. A minimum 1:200 fall shall be maintained during construction for gutter fall toward
downpipes when this is perpendicular to louvre direction.

Bewerten Sie dieses Handbuch

4.1/5 (5 Bewertungen)

Produktspezifikationen

Marke: Stratco
Kategorie: Nicht kategorisiert
Modell: Allure

Brauchst du Hilfe?

Wenn Sie Hilfe mit Stratco Allure benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten