Vestil CBFC-500 Bedienungsanleitung


Lies die bedienungsanleitung für Vestil CBFC-500 (13 Seiten) kostenlos online; sie gehört zur Kategorie Nicht kategorisiert. Dieses Handbuch wurde von 4 Personen als hilfreich bewertet und erhielt im Schnitt 4.8 Sterne aus 2.5 Bewertungen. Hast du eine Frage zu Vestil CBFC-500 oder möchtest du andere Nutzer dieses Produkts befragen? Stelle eine Frage

Seite 1/13
Rev. 3/6/2017 CBFC, manual.doc
Copyright 2017 Vestil Manufacturing Co. Page 1 of 13
CBFC COUNTERBALANCED FLOOR CRANE
OPERATION AND MAINTENANCE MANUAL
Receiving instructions:
After delivery, remove the packaging from the product. Inspect the product closely to determine whether it sustained damage
during transport. If damage is discovered, immediately record a complete description of the damage on the bill of lading. If the
product is undamaged, discard the packaging.
NOTES:
The end-user is solely responsible for confirming that product design, installation, use, and maintenance comply
with laws, regulations, codes, and mandatory standards applied where the product is used.
VESTIL MANUFACTURING CORP.
2999 North Wayne Street, P.O. Box 507, Angola, IN 46703
Telephone: (260) 665-7586 -or- Toll Free (800) 348-0868
Fax: (260) 665-1339
www.vestilmfg.com e-mail: [email protected]
Table of Contents
Signal words….………………………………………………………………………………………………………………………….. 2
Safe use recommendations………………………………………………………………..…………………………………………… 2
FIG. 1A: CBFC-500 exploded parts diagram & bill of materials…………………………………………………………………….. 3
FIG. 1B: CBFC-500 rated loads for specified boom lengths…….………………………………………………………………….. 4
FIG. 2A: CBFC-1000 exploded parts diagram & bill of materials…….…………………………………………………………….. 5
FIG. 2B: CBFC-1000 rated loads for specified boom lengths…..……………………………………………................................ 6
FIG. 3A: CBFC-2000 exploded parts diagram & bill of materials…………..……………………………………........................... 7
FIG. 3B: CBFC-2000 rated loads for specified boom lengths………………………………………………………………………. 8
FIG. 4: Manual hydraulic pump exploded parts diagram & bill of materials……………………………………………………….. 9
Operation…………………………………………………………………………………………………………………… ……………. 10
Operating the manual hydraulic pump………………..……………………………………………………………………………….. 10
Boom length adjustment………………………………………………………………………………………………………………… 11
Inspections………………………………………………………………………………………………….......................................... 11
Maintenance……….……………………………………………………………………………………………………………………... 12
Labeling diagram……...…………………………………………………………………………………………………………………. 12
Limited Warranty…...…………………………………………………………………………………………………………………….. 13


Produktspezifikationen

Marke: Vestil
Kategorie: Nicht kategorisiert
Modell: CBFC-500

Brauchst du Hilfe?

Wenn Sie Hilfe mit Vestil CBFC-500 benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten